Ongoing Projects

PATSON WHITE HOUSE

PATSON WHITE HOUSE

PATSON WHITE HOUSE 


Patson Builders

single_1
single_2
single_3


Floor Plan

Price

1.08 Crore –  1.23 Crore

BHK

2BHK / 3BHK

APRIL 2027

Completed Date

Location

CHROMEPET

Specifications




Foundation

Suitable Open Foundation will be provided based on Soil conditions understructural  engineer guidance.




Structure

1.RCC framed for beams, slabs, lintels, etc.. 2. AAC Block work –  9” Outer wall and 4” for Inner wall. 3. Cupboard using                Kadappa (4’0” length) in all the bed room.  4. Plastering:  Rough finish at outer, smooth finish at inner.




Kitchen Platform

R.C.C loft of 21” wide at a height of 7’0” from  floor  level in all the bed room at one side.  Kitchen platform will be of Black Galaxy  Granite 24” depth at a height of 2’6” from floor        level. Diamond stainless steel single bowl sink  with single drain board. (18”X24”)




Electrical and Plumbing

  1. Modular switches – NORWOOD/ROMA  Switches, 2. Orbit or Norwood wires, 3. A/C Point in all Bedrooms, 4. 5Amps at every  switch box, 5. 4nos of 15Amps provided, 6. TV  point in all bedrooms and hall. 7. Mixed Tap with cold water and hot water provided with  shower. (PARRYWARE) 8. PVC pipe for  External & CPVC pipe for Internal Concealed pipe. 9. Two ceramic wash basin.10. One INDIAN Closet with Tank and one WESTERN  Closet. 11. Switch points as per customer  choice.




Doors

  1. African Teak 1st Quality Main Door 3’6”X7’0” with  polishing, 2. Other doors -2nd Quality Teak frame with  premium Flush doors 3’0”X7’0”, 3. Toilet – PVC hard door single panel , 4. Windows – UPVC open window with grill and fittings provided. French window in  UPVC sliding connecting Balcony. 5. Grill – MS Square 8mm




Flooring

2×2 Vitrified Tiles for Living Room as well as Bedroom  @ Rs.60/ sq.ft, Whereas Toilet 7’ height Wall Tiles and Kitchen 2’ ht Wall Tiles provided-Rs.40/sq.ft) For Staircase:  Granite stone will be fixed for flooring  and SS Steel pipe will be fixed as hand railing.




For Car parking

Paver blocks will be laid throughout by marking respective flat number in Yellow paint with Lights




Painting

Inner wall – 2 coat Asian wall putty, 1 coat primer, 2  coat Tractor Emulsion with roller finish. Outer wall–2  coat cement paint, 2 coat of ACE/APEX Emulsion.  TEXTURE Paint at Front side/Doors & Grill Synthetic  Enamel Paint.




Weathering

Lime brick jelly with top covered by 12”x12”  weathering proof tiles.




S P E C I F I C A T I O N S

CCTV Surveillance 24X7/Automatic LIFT – 6 passengers /Covered CAR-2 Wheeler parking /Rain Water Harvesting/2nos–Borewells/ Automatic Water Controller/ Sump 12000 Litres / OHT 8000 Litres

  • client: Dr. Devis
  • Location: USA
  • Surface Area: 75,020 m
  • Architect: Alex Hales
  • Year Of Complited: 2017
  • Project Value: $950000

PATSON CROWN

PATSON CROWN

PATSON CROWN


Patson Builders

single_1
single_2
single_3

 

Floor Plan

Price

86.00 Lakhs –  88.00 Lakhs

BHK

3BHK

APRIL 2026

Completed Date

Location

OLD PALLAVARAM

Specifications


Foundation

Suitable Open Foundation will be provided based on Soil conditions understructural  engineer guidance.


Structure

1.RCC framed for beams, slabs, lintels, etc.. 2. AAC Block work –  9” Outer wall and 4” for Inner wall. 3. Cupboard using                Kadappa (4’0” length) in all the bed room.  4. Plastering:  Rough finish at outer, smooth finish at inner.


Kitchen Platform

R.C.C loft of 21” wide at a height of 7’0” from  floor  level in all the bed room at one side.  Kitchen platform will be of Black Galaxy  Granite 24” depth at a height of 2’6” from floor        level. Diamond stainless steel single bowl sink  with single drain board. (18”X24”)


Electrical and Plumbing

  1. Modular switches – NORWOOD/ROMA  Switches, 2. Orbit or Norwood wires, 3. A/C Point in all Bedrooms, 4. 5Amps at every  switch box, 5. 4nos of 15Amps provided, 6. TV  point in all bedrooms and hall. 7. Mixed Tap with cold water and hot water provided with  shower. (PARRYWARE) 8. PVC pipe for  External & CPVC pipe for Internal Concealed pipe. 9. Two ceramic wash basin.10. One INDIAN Closet with Tank and one WESTERN  Closet. 11. Switch points as per customer  choice.


Doors

  1. African Teak 1st Quality Main Door 3’6”X7’0” with  polishing, 2. Other doors -2nd Quality Teak frame with  premium Flush doors 3’0”X7’0”, 3. Toilet – PVC hard door single panel , 4. Windows – UPVC open window with grill and fittings provided. French window in  UPVC sliding connecting Balcony. 5. Grill – MS Square 8mm


Flooring

2×2 Vitrified Tiles for Living Room as well as Bedroom  @ Rs.60/ sq.ft, Whereas Toilet 7’ height Wall Tiles and Kitchen 2’ ht Wall Tiles provided-Rs.40/sq.ft) For Staircase:  Granite stone will be fixed for flooring  and SS Steel pipe will be fixed as hand railing.


For Car parking

Paver blocks will be laid throughout by marking respective flat number in Yellow paint with Lights


Painting

Inner wall – 2 coat Asian wall putty, 1 coat primer, 2  coat Tractor Emulsion with roller finish. Outer wall–2  coat cement paint, 2 coat of ACE/APEX Emulsion.  TEXTURE Paint at Front side/Doors & Grill Synthetic  Enamel Paint.


Weathering

Lime brick jelly with top covered by 12”x12”  weathering proof tiles.


S P E C I F I C A T I O N S

CCTV Surveillance 24X7/Automatic LIFT – 6 passengers /Covered CAR-2 Wheeler parking /Rain Water Harvesting/2nos–Borewells/ Automatic Water Controller/ Sump 12000 Litres / OHT 8000 Litres

  • client: Dr. Devis
  • Location: USA
  • Surface Area: 75,020 m
  • Architect: Alex Hales
  • Year Of Complited: 2017
  • Project Value: $950000

PATSON PARAGON

PATSON PARAGON

PATSON PARAGON


Patson Builders

single_1
single_2
single_3

 

Price

1.05 Crore

BHK

3BHK

JUNE 2026

Completed Date

Location

CHROMEPET

Floor Plan

Specifications


Foundation

  • Suitable Open Foundation will be provided based on Soil conditions under structural engineer guidance


Structure

  • RCC framed for beams, slabs, lintels, etc
  • AAC Block work 9” Outer wall and 4” for Inner wall
  • Cupboard using  Kadappa (4’0” length) in all the bed room
  • Plastering: Rough finish at outer, smooth finish at inner


Kitchen Platform

  • Kitchen platform will be of Black Galaxy Granite 24” depth at a height of 2’6” from floor level
  • Stainless steel single bowl sink with single drain board. (18”X24”)


Electrical and Plumbing

  • Modular switches – NORWOOD
  • ORBIT wires
  • A/C Point Hall & Bedrooms
  • 5Amps at every  switch box
  • 6nos of 15Amps provided
  • TV point in all bedrooms and hall
  • 2 In 1 with cold water and hot water provided with shower
  • PVC pipe for  External & CPVC pipe for Internal Concealed pipe
  • Three ceramic wash basin
  • THREE WESTERN closet (INDIAN CLOSET )
  • Switch points as per customer choice.


Doors

  • African Teak 1st Quality Main Door 3’6”X7’0” with  polishing
  • Other doors -2nd Quality Teak frame with  premium Flush doors 3’0”X7’0”
  • Toilet – WPC  door
  • Windows – UPVC Sliding window with mesh and grill provided
  • French window in UPVC sliding connecting Balcony
  • Grill – MS  Square 8mm


Flooring

  • 4×2 Vitrified Tiles for Living Room as well as Bedroom @ Rs.60/ sq.ft, Whereas Toilet 7’ height Wall Tiles  and Kitchen 2’ ht Wall Tiles provided-Rs.40/sq.ft)


For Staircase

  • Granite stone will be fixed for flooring and SS Steel pipe will be fixed as hand railing



Accordion Content


For Car parking

  • Paver blocks will be laid throughout by marking respective flat number in Yellow paint with Lights.


Painting

  • Inner wall – 2 coat Asian wall putty, 1 coat primer, 2 coat Royale Emulsion with roller finish
  • Outer wall – 2 coat cement paint, 2 coat of ACE/APEX Emulsion
  • TEXTURE Paint at Front side/Doors & Grill- Synthetic Enamel Paint


Weathering

  • Cement flooring with top covered by 12”x12” weathering UV proof tiles.


S P E C I F I C A T I O N S

CCTV 24 X 7 // Video Door Phone  //  Automatic Water Controller  // Automatic Lift -6 Passengers – upto Terrace // Metro Water Sump – 4000 litres  //  Bore Sumps – 6000 litres Pressure Pump   // Metro Over Head Tank  //  Bore Over Head Tank

 

  • client: Dr. Devis
  • Location: USA
  • Surface Area: 75,020 m
  • Architect: Alex Hales
  • Year Of Complited: 2017
  • Project Value: $950000

PATSON POLARIS

PATSON POLARIS

PATSON POLARIS


Patson Builders

single_1
single_2
single_3

 

Price

1.12 Crore

BHK

3BHK

SEPTEMBER 2026

Completed Date

Location

Pallavaram

Floor Plan

Specifications


Foundation

  • Suitable Open Foundation will be provided based on Soil conditions under structural engineer guidance


Structure

  • RCC framed for beams, slabs, lintels, etc
  • AAC Block work 9” Outer wall and 4” for Inner wall
  • Cupboard using  Kadappa (4’0” length) in all the bed room
  • Plastering: Rough finish at outer, smooth finish at inner
  • Ceiling Height – 11’0” (Eleven Feet)


Kitchen Platform

  • Kitchen platform will be of Black Galaxy Granite 24” depth at a height of 2’6” from floor level
  • Diamond stainless steel single bowl sink with single drain board. (18”X24”)


Electrical and Plumbing

  • Modular switches – GM Switches or Equivalent
  • ORBIT wires or Equivalent
  • A/C Point Hall & Bedrooms
  • 5Amps at every  switch box
  • 6nos of 15Amps provided
  • TV point in all bedrooms and hall
  • DIVERTER with cold water and hot water provided with shower (JAGUAR)
  • PVC pipe for  External & CPVC pipe for Internal Concealed pipe
  • Three ceramic wash basin
  • WESTERN closet for all bathrooms ( JAGUAR OR EQUIVALENT )
  • Switch points as per customer choice.


Doors

  • African Teak 1st Quality Main Door 3’6”X7’0” with  polishing (Price -20,000)
  • Other doors -2nd Quality Teak frame with  premium Flush doors 3’0”X8’0” (Price -6,000)
  • Toilet – WPC  door (Price – 4,000)
  • Windows – UPVC Sliding window with mesh and grill provided
  • French window in UPVC sliding connecting Balcony
  • Grill – MS  Square 8mm


Flooring

  • 4×2 Vitrified Tiles for Living Room as well as Bedroom @ Rs.70/ sq.ft, Whereas Toilet 7’0” height Wall Tiles  and Kitchen 2’ ht Wall Tiles provided-Rs.50/sq.ft


For Staircase

  • Granite stone will be fixed for flooring and SS Steel pipe will be fixed as hand railing


For Car parking

  • Paver blocks will be laid throughout by marking respective flat number in Yellow paint with Lights.


Painting

  • Inner wall – 2 coat Asian wall putty, 1 coat primer, 2 coat Royale Emulsion with roller finish
  • Outer wall – 2 coat cement paint, 2 coat of ACE/APEX Emulsion
  • TEXTURE Paint at Front side/Doors & Grill- Synthetic Enamel Paint


Weathering

  • Cement flooring with top covered by 12”x12” weathering UV proof tiles.


S P E C I F I C A T I O N S

CCTV 24 X 7 // Video Door Phone  //  Automatic Water Controller // Automatic Lift -6 Passengers – upto Terrace // Metro Water Sump – 5000 litres  //  Bore Sump – 8000 litres //Pressure Pump   // Metro Over Head Tank – 2500 litres  // Bore Over Head Tank – 4500 litres

  • client: Dr. Devis
  • Location: USA
  • Surface Area: 75,020 m
  • Architect: Alex Hales
  • Year Of Complited: 2017
  • Project Value: $950000

PATSON WOODROCK

PATSON WOODROCK

PATSON WOODROCK


Patson Builders

single_1
single_2
single_3


Floor Plan

Price

1.32 Crore

BHK

3BHK

NOVEMBER 2026

Completed Date

Location

ZAMIN PALLAVARAM

Specifications




Foundation

  • Suitable Open Foundation will be provided based on Soil conditions under structural engineer guidance




Structure

  • RCC framed for beams, slabs, lintels, etc
  • AAC Block work 9” Outer wall and 4” for Inner wall
  • Cupboard using  Kadappa (4’0” length) in all the bed room
  • Plastering: Rough finish at outer, smooth finish at inner
  • Ceiling Height – 10’0” (TEN Feet)

 




Kitchen Platform

  • Kitchen platform will be of Black Galaxy Granite 24” depth at a height of 2’6” from floor level
  • Stainless steel single bowl sink with single drain board. (18”X24”)




Electrical and Plumbing

  • Modular switches – NORWOOD Switches or Equivalent
  • ORBIT wires or Equivalent
  • A/C Point Hall & Bedrooms
  • 5Amps at every  switch box
  • 6nos of 15Amps provided
  • TV point in all bedrooms and hall
  • 2 in 1 with cold water and hot water provided with shower (PARRYWARE)
  • PVC pipe for  External & CPVC pipe for Internal Concealed pipe
  • Ceramic wash basin per Bathroom
  • WESTERN closet for all bathrooms (PARRYWARE,JOHNSON or EQUIVALENT )
  • Switch points as per customer choice.

 




Doors

  • African Teak 1st Quality Main Door 3’6”X7’0” with  polishing (Price -20,000)
  • Other doors -2nd Quality Teak frame with  premium Flush doors 3’0”X8’0” (Price -6,000)
  • Toilet – WPC  door (Price – 4,000)
  • Windows – UPVC Sliding window with mesh and grill provided
  • French window in UPVC sliding connecting Balcony
  • Grill – MS  Square 8mm




Flooring

  • 4×2 Vitrified Tiles for Living Room as well as Bedroom @ Rs.60/ sq.ft, Whereas Toilet 7’0” height Wall Tiles  and Kitchen 2’ ht Wall Tiles provided-Rs.50/sq.ft




For Staircase

  • Granite stone will be fixed for flooring and SS Steel pipe will be fixed as hand railing




For Car parking

  • Paver blocks will be laid throughout by marking respective flat number in Yellow paint with Lights.




Painting

  • Inner wall – 2 coat Asian wall putty, 1 coat primer, 2 coat Royale Emulsion with roller finish
  • Outer wall – 2 coat cement paint, 2 coat of ACE/APEX Emulsion
  • TEXTURE Paint at Front side/Doors & Grill- Synthetic Enamel Paint




Weathering

  • Cement flooring with top covered by 12”x12” weathering UV proof tiles.




S P E C I F I C A T I O N S

CCTV 24 X 7 // Video Door Phone // Automatic Water Controller // Automatic Lift -6 Passengers – upto Terrace // Metro Water Sump – 5000 litres  //  Bore Sump – 8000 litres Pressure Pump   // Metro Over Head Tank – 2500 litres    Bore Over Head Tank – 4500 litres

  • client: Dr. Devis
  • Location: USA
  • Surface Area: 75,020 m
  • Architect: Alex Hales
  • Year Of Complited: 2017
  • Project Value: $950000

PATSON MEADOWS

PATSON MEADOWS

PATSON MEADOWS


Patson Builders

single_1
single_2
single_3

 

Price

1.32 Crore – 1.53 Crore

BHK

3BHK

JANUARY 2027

Completed Date

Location

MADIPAKKAM

Floor Plan

Specifications


Foundation

  • Suitable Open Foundation will be provided based on Soil conditions under structural engineer guidance


Structure

  • RCC framed for beams, slabs, lintels, etc
  • AAC Block work 9” Outer wall and 4” for Inner wall
  • Cupboard using  Kadappa (4’0” length) in all the bed room
  • Plastering: Rough finish at outer, smooth finish at inner
  • Ceiling Height – 10’0” (Ten Feet)


Kitchen Platform

  • Kitchen platform will be of Black Galaxy Granite 24” depth at a height of 2’6” from floor level
  • Diamond stainless steel single bowl sink with single drain board. (18”X24”)


Electrical and Plumbing

  • Modular switches – GM Switches or Equivalent
  • ORBIT wires or Equivalent
  • A/C Point Hall & Bedrooms
  • 5Amps at every  switch box
  • 6nos of 15Amps provided
  • TV point in all bedrooms and hall
  • DIVERTER with cold water and hot water provided with shower (JAGUAR)
  • PVC pipe for  External & CPVC pipe for Internal Concealed pipe
  • Three ceramic wash basin
  • WESTERN closet for all bathrooms ( JAGUAR OR EQUIVALENT )
  • Switch points as per customer choice.


Doors

  • African Teak 1st Quality Main Door 3’6”X7’0” with  polishing (Price -20,000)
  • Other doors -2nd Quality Teak frame with  premium Flush doors 3’0”X7’0” (Price -6,000)
  • Toilet – WPC  door (Price – 4,000)
  • Windows – UPVC Sliding window with mesh and grill provided
  • French window in UPVC sliding connecting Balcony
  • Grill – MS  Square 10 mm


Flooring

  • 4×2 Vitrified Tiles for Living Room as well as Bedroom @ Rs.70/ sq.ft, Whereas Toilet 7’0” height Wall Tiles  and Kitchen 2’ ht Wall Tiles provided-Rs.50/sq.ft



Accordion Content


For Staircase

  • Granite stone will be fixed for flooring and SS Steel pipe will be fixed as hand railing


For Car parking

  • Paver blocks will be laid throughout by marking respective flat number in Yellow paint with Lights.


Painting

  • Inner wall – 2 coat Asian wall putty, 1 coat primer, 2 coat Royale Emulsion with roller finish
  • Outer wall – 2 coat cement paint, 2 coat of ACE/APEX Emulsion

TEXTURE Paint at Front side/Doors & Grill- Synthetic Enamel Paint


Weathering

  • Cement flooring with top covered by 12”x12” weathering UV proof tiles.


S P E C I F I C A T I O N S

CCTV 24 X 7 // Video Door Phone  //  Automatic Water Controller // Automatic Lift -6 Passengers – upto Terrace//Metro Water Sump – 5000 litres  //  Bore Sump – 8000 litres // Pressure Pump   // Metro Over Head Tank – 2500 litres //Bore Over Head Tank – 4500 litres

 

  • client: Dr. Devis
  • Location: USA
  • Surface Area: 75,020 m
  • Architect: Alex Hales
  • Year Of Complited: 2017
  • Project Value: $950000

PATSON SUNLIGHT & SKYLIGHT

PATSON SUNLIGHT & SKYLIGHT

PATSON SUNLIGHT & SKYLIGHT


Patson Builders

single_1
single_2
single_3

 

Price

1.03 Crore

BHK

3BHK

JUNE 2026

Completed Date

Location

CHROMEPET

Floor Plan

Specifications


Foundation

Suitable Open Foundation will be provided based on Soil conditions under                       structural engineer guidance.


Structure

  • RCC framed for beams, slabs, lintels, etc
  • AAC Block work  9” Outer wall and 4” for Inner wall
  • Cupboard using  Kadappa (4’0” length) in all the bed room
  • Plastering: Rough finish at outer, smooth finish at inner
  • Ceiling Height – 11’0” (Eleven Feet)


Kitchen Platform

  • Kitchen platform will be of Black Galaxy Granite 24” depth at a height of 2’6” from floor level
  • Diamond stainless steel single bowl sink with single drain board. (18”X24”)


Electrical and Plumbing

  • Modular switches – GM Switches or Equivalent
  • ORBIT  wires or Equivalent
  • A/C Point Hall & Bedrooms
  • 5Amps at every  switch box
  • 6nos of 15Amps provided
  • TV point in all bedrooms and hall
  • DIVERTER with cold water and hot water provided with shower (JAGUAR)
  • PVC pipe for  External & CPVC pipe for Internal Concealed pipe
  • Three ceramic wash basin
  • WESTERN closet for all bathrooms ( JAGUAR OR EQUIVALENT )
  • Switch points as per customer choice.


Doors

  • African Teak 1st Quality Main Door 3’6”X7’0” with  polishing (Price -20,000)
  • Other doors -2nd  Quality Teak frame with  premium Flush doors 3’0”X8’0” (Price -6,000)
  • Toilet – WPC  door (Price – 4,000)
  • Windows – UPVC Sliding window with mesh and grill provided
  • French window in UPVC sliding connecting Balcony
  • Grill – MS  Square 8mm


Flooring

4×2 Vitrified Tiles for Living Room as well as Bedroom @ Rs.70/ sq.ft, Whereas Toilet 7’0” height Wall Tiles  and Kitchen 2’ ht Wall Tiles provided-Rs.50/sq.ft

  • client: Dr. Devis
  • Location: USA
  • Surface Area: 75,020 m
  • Architect: Alex Hales
  • Year Of Complited: 2017
  • Project Value: $950000

PATSON SERENITY & ETERNITY

PATSON SERENITY & ETERNITY


Patson Builders

single_1
single_2
single_3

 

Floor Plan

Price

1.02 Crore – 1.23 Crore

BHK

2BHK / 3BHK

Completed Date

SEPTEMBER 2026

Location

MADIPAKKAM

Specifications


Foundation

  • Suitable Open Foundation will be provided based on Soil conditions under structural engineer guidance


Structure

  • RCC framed for beams, slabs, lintels, etc
  • AAC Block work 9” Outer wall and 4” for Inner wall
  • Cupboard using  Kadappa (4’0” length) in all the bed room
  • Plastering: Rough finish at outer, smooth finish at inner
  • Ceiling Height – 10’0” (TEN Feet)


Kitchen Platform

  • Kitchen platform will be of Black Galaxy Granite 24” depth at a height of 2’6” from floor level
  • Stainless steel single bowl sink with single drain board. (18”X24”)


Electrical and Plumbing

  • Kitchen platform will be of Black Galaxy Granite 24” depth at a height of 2’6” from floor level
  • Stainless steel single bowl sink with single drain board. (18”X24”)


Doors

  • Modular switches – NORWOOD Switches or Equivalent
  • ORBIT wires or Equivalent
  • A/C Point Hall & Bedrooms
  • 5Amps at every  switch box
  • 6nos of 15Amps provided
  • TV point in all bedrooms and hall
  • 2 in 1 with cold water and hot water provided with shower (PARRYWARE)
  • PVC pipe for  External & CPVC pipe for Internal Concealed pipe
  • Ceramic wash basin per Bathroom
  • WESTERN closet for all bathrooms (PARRYWARE,JOHNSON or EQUIVALENT )
  • Switch points as per customer choice.


Flooring

  • African Teak 1st Quality Main Door 3’6”X7’0” with  polishing (Price -20,000)
  • Other doors -2nd Quality Teak frame with  premium Flush doors 3’0”X8’0” (Price -6,000)
  • Toilet – WPC  door (Price – 4,000)
  • Windows – UPVC Sliding window with mesh and grill provided
  • French window in UPVC sliding connecting Balcony
  • Grill – MS  Square 8mm


Flooring

  • 4×2 Vitrified Tiles for Living Room as well as Bedroom @ Rs.60/ sq.ft, Whereas Toilet 7’0” height Wall Tiles  and Kitchen 2’ ht Wall Tiles provided-Rs.50/sq.ft


For Staircase

  • Granite stone will be fixed for flooring and SS Steel pipe will be fixed as hand railing


For Car parking

  • Paver blocks will be laid throughout by marking respective flat number in Yellow paint with Lights.


Painting

  • Inner wall – 2 coat Asian wall putty, 1 coat primer, 2 coat Royale Emulsion with roller finish
  • Outer wall – 2 coat cement paint, 2 coat of ACE/APEX Emulsion
  • TEXTURE Paint at Front side/Doors & Grill- Synthetic Enamel Paint


Weathering

  • Cement flooring with top covered by 12”x12” weathering UV proof tiles.


S P E C I F I C A T I O N S

CCTV 24 X 7 // Video Door Phone // Automatic Water Controller // Automatic Lift -6 Passengers – upto Terrace//Metro Water Sump – 5000 litres  //  Bore Sump – 8000 litres //Pressure Pump   // Metro Over Head Tank – 2500 litres  // Bore Over Head Tank – 4500 litres

  • client: Dr. Devis
  • Location: USA
  • Surface Area: 75,020 m
  • Architect: Alex Hales
  • Year Of Complited: 2017
  • Project Value: $950000

PATSON BANYAN TREE

PATSON BANYAN TREE

PATSON BANYAN TREE


Patson Builders

single_1
single_2
single_3

 

Price

Completed Date

Location

Pallavaram

BHK

Floor Plan

Specifications


Foundation

Suitable Open Foundation will be provided based on Soil conditions under structural engineer guidance


Structure

  • RCC framed for beams, slabs, lintels, etc
  • AAC Block work  9” Outer wall and 4” for Inner wall
  • Cupboard using  Kadappa (4’0” length) in all the bed room
  • Plastering: Rough finish at outer, smooth finish at inner
  • Ceiling Height – 11’0” (Eleven Feet)


Kitchen Platform

  • Kitchen platform will be of Black Galaxy Granite 24” depth at a height of 2’6” from floor level
  • Diamond stainless steel single bowl sink with single drain board. (18”X24”)


Electrical and Plumbing

  • Modular switches – GM Switches or Equivalent
  • ORBIT  wires or Equivalent
  • A/C Point Hall & Bedrooms
  • 5Amps at every  switch box
  • 6nos of 15Amps provided
  • TV point in all bedrooms and hall
  • DIVERTER with cold water and hot water provided with shower (JAGUAR)
  • PVC pipe for  External & CPVC pipe for Internal Concealed pipe
  • Three ceramic wash basin
  • WESTERN closet for all bathrooms ( JAGUAR OR EQUIVALENT )
  • Switch points as per customer choice.


Doors

  • African Teak 1st Quality Main Door 3’6”X7’0” with  polishing (Price -20,000)
  • Other doors -2nd  Quality Teak frame with  premium Flush doors 3’0”X8’0” (Price -6,000)
  • Toilet – WPC  door (Price – 4,000)
  • Windows – UPVC Sliding window with mesh and grill provided
  • French window in UPVC sliding connecting Balcony
  • Grill – MS  Square 8mm


Flooring

4×2 Vitrified Tiles for Living Room as well as Bedroom @ Rs.70/ sq.ft, Whereas Toilet 7’0” height Wall Tiles  and Kitchen 2’ ht Wall Tiles provided-Rs.50/sq.ft

  • client: Dr. Devis
  • Location: USA
  • Surface Area: 75,020 m
  • Architect: Alex Hales
  • Year Of Complited: 2017
  • Project Value: $950000